Wuxi Poly Fertilizer Co., Ltd. Freight Terminal Project Environmental Impact Assessment First Public Announcement

Time:2021-03-01      Click:0

According to the requirements of the "Measures for Public Participation in Environmental Impact Assessment" (Order No. [2018] 4 of the Ministry of Ecology and Environment), it is now necessary to; The information related to the environmental impact assessment of the Wuxi Poly Fertilizer Co., Ltd. Freight Terminal Project will be publicly disclosed for public participation, in order to widely understand the attitudes of the public from all walks of life towards the impact of the production process on the surrounding environment and residents, as well as their opinions and suggestions on environmental protection, and to accept supervision from the public. The specific content is as follows:

 

1、 Name and Overview of the Construction Project

Project Name: Wuxi Poly Fertilizer Co., Ltd. Freight Terminal Project

Construction unit: Wuxi Poly Fertilizer Co., Ltd

Construction location: Henggang River, Yuqi Street, Huishan District, Wuxi City

Construction scale and content: The length of the cargo terminal berth is 398.6 meters, with four 1000 ton general cargo berths and one 1000 ton dangerous cargo berth. The main cargo types are sulfuric acid and fertilizer, with an annual currency capacity of 20000 tons of sulfuric acid and 500000 tons of fertilizer. During the implementation of the project, no nationally restricted or eliminated process equipment will be used, and no nationally restricted or eliminated products will be produced. Energy conservation, environmental protection, safety, fire protection, and occupational disease hazard prevention measures will be implemented simultaneously to meet relevant national standards.

 

2、 Name and contact information of the construction unit

Construction unit: Wuxi Poly Fertilizer Co., Ltd

Mailing address: Yuqi Supporting Area, Huishan Economic Development Zone, Wuxi (No.1 Qibei Road)

Contact: Manager Qin Email: 260501210@qq.com Contact information: 0510-83897396

 

3、 Name of the unit responsible for preparing the Environmental Impact Assessment Report

Environmental Impact Assessment Unit: Nanjing Guohuan Technology Co., Ltd

Contact: Mr. Li Email: lixj16@126.com Contact number: 025-86773199

 

4、 Public Opinion Form

The public opinion form is attached.

 

5、 Ways and channels for submitting public opinion forms

The public can contact the construction unit through email, telephone, fax, letter, visit and other means to provide opinions and suggestions.


6、 Deadline for soliciting public opinions and feedback methods

The deadline for soliciting public opinions is from the date of announcement to the process of preparing the draft of the environmental impact assessment report. The public can provide opinions related to the environmental impact assessment to the construction unit.

The construction unit will carefully verify the reported situation, and any opinions or suggestions found to be true through investigation will be adopted and will be integrated throughout the entire project construction process.

 

Wuxi Poly Fertilizer Co., Ltd

March 1st, 2021


Annex:Public Opinion Form for Environmental Impact Assessment of Construction Projects.pdf

 

Return to List
*Some of the information on this website is sourced from the internet and is only for personal research, communication, and learning purposes. If there is any infringement, please inform us to delete it.