Time:2021-05-08 Click:0
According to the requirements of the "Measures for Public Participation in Environmental Impact Assessment" (Order No. [2018] 4 of the Ministry of Ecology and Environment), the "; The relevant information of the Wuxi Poly Fertilizer Co., Ltd. Freight Terminal Project is announced to the public as follows:
1、 Brief description of construction project situation
Project Name: Freight Terminal Project
Construction location: Henggang River, Yuqi Town, Huishan District, Wuxi.
Wuxi Poly Fertilizer Co., Ltd. has built a 1000DWT berth wharf (hereinafter referred to as the "Poly Fertilizer Wharf"), which is located in the Yuqi Supporting Area (No.1 Qibei Road) of Huishan Economic Development Zone, Wuxi, on the north bank of Henggang River. The terminal obtained the Port Operation License (Certificate No.: (Su Xihui) Port Economic Certificate (0020)) and the Port Dangerous Goods Operation Certificate (Certificate No.: (Su Xihui) Port Economic Certificate (0020) - M001) on June 15, 2018. The main cargo types loaded and unloaded at this terminal are sulfuric acid and fertilizer, with an annual capacity of 20000 tons of sulfuric acid and 500000 tons of fertilizer.
2、 Name and contact information of the construction unit
Construction unit: Wuxi Poly Fertilizer Co., Ltd
Mailing address: Yuqi Supporting Area, Huishan Economic Development Zone, Wuxi (No.1 Qibei Road)
Contact: Manager Qin Email: 260501210@qq.com Contact information: 0510-83897396
3、 The full text of the draft environmental impact assessment report for soliciting opinions, network links, and ways and channels to access the paper report
The public can view the draft environmental impact assessment report for soliciting opinions through online public announcement within 10 working days from the date of public announcement, or check the paper report at the environmental impact assessment unit and construction unit.
The full text of the draft Environmental Impact Assessment Report for soliciting opinions can be found online at:
http://www.wblhf.cn/xinwenzhognxin/qiyexinwen
Ways and channels to access paper reports: Nanjing Guohuan Technology Co., Ltd
4、 The public scope for soliciting public opinions
The scope of this public opinion solicitation is individuals or groups who may be affected near the construction project.
5、 The network link of the public opinion form
The online link for the public opinion form can be found at: http://www.en.wxblhf.com.cn/xinwenzhongxin/qiyexinwen
6、 Ways and means of expressing opinions
If you have any opinions or suggestions on the project, please submit the completed public opinion form (see link) to the construction unit within 10 working days from the date of public announcement by letter, fax, email, etc.
7、 The starting and ending time for public opinions
The public announcement period is 10 working days from the date of announcement.
Enclosure:
Environmental Impact Assessment of Poly Fertilizer Freight Terminal (Draft for Comments).pdf